KEY BENEFITS

Feature Benefit
Certified & Tested Agrément SA approval for all road classes
Lower Costs Up to 40% savings on construction
Faster Construction Open roads within 1–3 days
Environmental Reduced material transport & GHG emissions
Longevity Over 20 years of performance in some projects
Versatility Works with sands, gravels, and crushed stone

COMPARATIVE ANALYSIS

Criteria Ecobond Cement/Lime Traditional Gravel
Crack Resistance High Low N/A
Water Resistance High Medium Low
Traffic Readiness 1–3 days 7–14 days N/A
Cost Low Medium High
Environmental Impact Low Medium High

SELECTED PROJECT HIGHLIGHTS

  • R511 Sandton, SA - 60,000 vehicles/day, constructed & opened in 3 days.
  • Gautrans Test Road - Carried over 50M E80s in 20 years with heavy coal traffic.
  • DRC Mine Haul Roads - Reduced dust by >90%, lowering water use.
  • Soshanguve, SA -30% cost savings for City of Tshwane.
  • Savuti, Botswana Pond Lining - 20 years submerged, zero leaks.

TECHNICAL DATA SUMMARY

  • Performance (24hr Soaked ITS):
  • Natural Gravel: 100-150 kPa

IMPLEMENTATION & SUPPORT

  • Training for contractors & engineers (~1 hour for design differences).
  • Mix design & QA testing by accredited independent labs.
  • Supply chain & contractor support across Africa.