KEY BENEFITS
Feature | Benefit |
---|---|
Certified & Tested | Agrément SA approval for all road classes |
Lower Costs | Up to 40% savings on construction |
Faster Construction | Open roads within 1–3 days |
Environmental | Reduced material transport & GHG emissions |
Longevity | Over 20 years of performance in some projects |
Versatility | Works with sands, gravels, and crushed stone |
COMPARATIVE ANALYSIS
Criteria | Ecobond | Cement/Lime | Traditional Gravel |
---|---|---|---|
Crack Resistance | High | Low | N/A |
Water Resistance | High | Medium | Low |
Traffic Readiness | 1–3 days | 7–14 days | N/A |
Cost | Low | Medium | High |
Environmental Impact | Low | Medium | High |
SELECTED PROJECT HIGHLIGHTS
- R511 Sandton, SA - 60,000 vehicles/day, constructed & opened in 3 days.
- Gautrans Test Road - Carried over 50M E80s in 20 years with heavy coal traffic.
- DRC Mine Haul Roads - Reduced dust by >90%, lowering water use.
- Soshanguve, SA -30% cost savings for City of Tshwane.
- Savuti, Botswana Pond Lining - 20 years submerged, zero leaks.
TECHNICAL DATA SUMMARY
- Performance (24hr Soaked ITS):
- Natural Gravel: 100-150 kPa
IMPLEMENTATION & SUPPORT
- Training for contractors & engineers (~1 hour for design differences).
- Mix design & QA testing by accredited independent labs.
- Supply chain & contractor support across Africa.